Language
Chinese
English
language
中国
韩国
韩国
韩国
韩国
韩国
Suzhou Surge Power Technology Co., Ltd.

NEWS CENTER

We specialize in home energy storage, industrial and commercial energy storage

/
/
/
Correct installation method and precautions for solar pv battery storage

Correct installation method and precautions for solar pv battery storage

(Summary description)Connect the positive and negative poles of the LED output terminal of solar pv battery storage (brown as the positive pole and blue as the negative pole) to the positive and negative poles of the lamp. At this time, apply waterproof tape to prevent short circuit.

Correct installation method and precautions for solar pv battery storage

(Summary description)Connect the positive and negative poles of the LED output terminal of solar pv battery storage (brown as the positive pole and blue as the negative pole) to the positive and negative poles of the lamp. At this time, apply waterproof tape to prevent short circuit.

Information

Step 1: Connect the positive and negative poles of the LED output terminal of solar pv battery storage (brown as the positive pole and blue as the negative pole) to the positive and negative poles of the lamp. At this time, apply waterproof tape to prevent short circuit.

solar pv battery storage

Step 2: Connect two yellow and green wires (the two wires are the switches of the controller, please disconnect them and wrap them with waterproof tape when not installing), and wrap them with waterproof tape (the ones with better quality and the most stretched ones) Good), it is absolutely not allowed to short-circuit the switch wire with the positive pole of the LED.

Step 3: Wait for about one minute for the LED to turn on, then connect the solar photovoltaic panel (the red wire of solar pv battery storage is connected to the positive pole of the photovoltaic panel, and the black wire of solar pv battery storage is connected to the negative pole of the photovoltaic panel), and then wait 1 In about a minute, the LED will turn off. At this time, apply waterproof tape to prevent short circuit.

Step 4: Use waterproof tape to reinforce all connecting parts to ensure firm connections and no exposed copper wires. At this time, you can erect the light pole for installation, pay attention to the installation direction of the solar panel (avoid getting too close to the high-voltage wire and obstructing).

Installation Precautions

1) The connection of all wires must be firm, and bare copper wires are prohibited from touching each other (including cross-connecting), which will easily damage the controller and cause protection of the lithium battery protection board, and the light will not turn on. During the installation process, it is forbidden to short-circuit between wires.

2) The waiting time for the light during the wiring process will vary according to the time set by the controller. The factory lithium battery capacity is generally half-charged, and the light will be darker when it is first installed. It is within the normal range and is normally charged. Lights up normally after 2-3 days.

3) The installation time of solar pv battery storage is generally carried out during the day, and it is not suitable to install it at night.
 

Keyword:

Scan the QR code to read on your phone

Relevant Information

Related Products
PRODUCT
 PU-15K-L-51.2V280AH
PU-15K-L-51.2V280AH
 PU-10K-L-51.2V205AH
PU-10K-L-51.2V205AH
 PU-7.5K-L-51.2V150AH
PU-7.5K-L-51.2V150AH
 PU-5K-L-51.2V100AH&25.6V200AH
PU-5K-L-51.2V100AH&25.6V200AH

CONTACT US

Sales Hotline: +86-18114616225
Contact us
FOLLOW US
twitter
facebook
linkedin
youtube
google-app

Copyright © 2021  Suzhou Surge Power Technology Co., Ltd.  All Rights Reserved    苏ICP备2020068098号-1  Privacy Policy

Powered by:www.300.cn   IPv6 is supported